Stages:
Sectors:
Locations:
Min Investment:
Max Investment:
Target Investment:
Padre Conceicao College of Engineering
(2006 - 2013)
Total Funding: $100M
Total Funding: $170M
Total Funding: $15M
Total Funding: $2M
Total Funding: $410M
Total Funding: $32M
Total Funding: $46M
Total Funding: $7.1M
Total Funding: $57M
Total Funding: $340M
2021
Responsible for the detail design of the BWMS retrofit from the initial feasibility study, Preparation of Piping and Instrumentation Diagrams, 3D modelling of piping systems and the detailed fabrications drawings for production with consideration of minimal modification and cost effectiveness. I am also responsible for the Product management involving designing and modification of 3d models and preparation of technical drawings.
2019 - 2021
2019 - 2021
Responsible for the 3D modelling of Piping systems and Structural supports for various equipment's with CAD software's along with detailed fabrications drawings for assisting in production and installation onsite. Conducted research, gathered information from various sources within the time frame allocated with successful results.